Have a VIN and Scheduled July 19th!!

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

tooldrmr2009

Full Access Member
Joined
Jun 23, 2021
Posts
760
Reaction score
1,491
Location
Fort Wayne Indiana
I have been told that when you see your truck "In production" is when the chassis shows up at the Detroit Plant. That usually takes place about 7 days prior to your blend/build date.
I'm assuming you mean the frame cause the cab is built on sight. The way I heard it from my source, the truck is in production status when all the parts are scanned ect into the system and the frame is ordered from the yard(storage areas). But with the tracker being delayed a lot I'm sure there is a delay in this
 

ashleyg

Member
Joined
Jun 10, 2021
Posts
35
Reaction score
25
Location
91364
My 8/23 build week just got pushed to 9/20 build week... 37 package.... anyone else in the same boat?....checked last week and was still on course for 8/23
 
Top