no1
Full Access Member
- Joined
- Apr 2, 2015
- Posts
- 520
- Reaction score
- 709
...
Last edited:
Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.
Yes that is the issue with squared one, it will not look good imo. Grinding **** maybe an 1-2 hours not longer. Most of my time went to walking from one end to another in my friends metal shop, man it is huge place and messy one. I was in one far corner making mine and running stuff from other end where i was cutting. Part that takes time is cutting all in right length and figuring all out. Even i had good plan what to do, there will come some small things that you want to change and that takes more time. I had today only two hours to do my rack and most of time went to figuring how to mount jack on that. Easiest part would be order jack with mounting plate from US but it would be here in March and that would be too late. I have now some sort of plan how to do it and i hope friend can laser cut me few pieces for it tomorrow. Lets hope i can get it moving again tomorrow.
Those are not done yet on pic i posted and those are coming on end of tubes, only middle ones i have to cut to tubes. I'm still not 100% is it quick mount or do i take bed bolts away every time i use rack. I hate rattling parts so might try both lol. I posted one pic in post #13 but will probably use bolt to connecting those two parts.