warrior
Your Wife's Personal Trainer
- Joined
- Aug 19, 2010
- Posts
- 819
- Reaction score
- 152
ordered July 28th
build date (finally) Jan 9
Avalanche supercrew.
build date (finally) Jan 9
Avalanche supercrew.
Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.
Ordered 7/26 - Allocaton #2 of 4 at the dealership
9/1 - after informing my dealership about what I read on this forum about the CF option I, I received confirmation from them that I should ditch the CF package to ensure prompt scheduling
12/13- Again, after informing my dealership about what I read on this forum about the beadlock wheels, I got confirmation several days later that beadlock wheels need to be removed to ensure scheduling
12/15 was assigned a VIN and build week of Jan 9
Note: During the week of 12/12, the dealer handling my order really went to bat for me and put a lot of effort into inquiring up the chain of command at Ford as to why my order had not been pulled. He provided me daily updates (sometimes a few updates per day) from 12/12 to 12/15 when the order was finally pulled. Most of us ordering know a lot more about the process than the dealers do and we often get wind of updates (e.g. the CF and Beadlock shortages) prior to it being widely known throughout the network of dealers and even the Ford Zone Reps (neither my dealer nor the Ford Zone rep knew about the beadlocks prior to me asking about it on 12/8). If you are inpatient like me, politely keep in touch with your dealer and inform them about what you find out on the forum. Mine appreciated learning from what I gleaned off the forum and it helps him to be more informed about this process so that he can be a better salesman for future customers.
Received notice today that our raptor is release and awaiting shipping. Who the heck knows how long that will be. Lol
They must have released a pile of them over the weekend. I had been checking my vehicle visibility source multiple times a day for our first order and my truck (2nd order). As of Saturday the status hadn't changed. But this morning when I checked both of the trucks were released as of Saturday.
First order was built 10/14 and my truck was built 11/26
sorry as it may be posted somewhere but, where do I find this vehicle visibility source? I hate to be the 500th caller to FP today if I can just look it up... thanks.