NeoLeo
Active Member
Dealer just informed me of VIN and build date scheduled for July 26, 2021. He also added that he didn’t believe but didn’t say why
35”, 801A, PowerTech, CF, Bedliner, Folding Tonneau, Twin-Panel Moonroof - Code Orange
35”, 801A, PowerTech, CF, Bedliner, Folding Tonneau, Twin-Panel Moonroof - Code Orange