View attachment 481661
this was one of those rare weekends that I could set my phone to do-not-disturb and pump out work. THANK YOU RPG - they came through with the slotted front lca plate and frame doubler plate. I was about to move forward without plating and the package arrived just in time - thank you very much if you're reading this. I requested the slotted front LCA plates, and drilled them so I can use eccentric cams.
View attachment 481652
I drove into shop @ 6am saturday morning and pulled the bed first. Then we pulled the cab, it took 2 hours <<the flying wrenches cab pull youtube video is great btw>>.
View attachment 481662
This was followed by exhaust, driveshafts, engine/trans, fuel tank, brake lines and wiring harness. It all swapped over, can now tell you with certainty the generation 3 frame + axles is 98% plug and play.
**Rear driveshaft flanges are different** was the only oops surprise and luckily I had a gen 3 flange on a shelf already, need to swap it out this week. Minor drilling and tapping of M8 was needed for grounds and various harness tabs. ABS bracket needed an M8
View attachment 481655
Everything was examined closely before reinstallation and there were some problems. both motor mounts were shot (will post a photo to show). Replacing with Gen3 motor mounts - they are nicer looking, unsure if stronger? Also front diff bushings completely destroyed. I have a lot to say about this, will save for another post.
View attachment 481663