beachz
Full Access Member
Concur with the above. Once you have a VIN, they have allocated the parts and are staging to build. No reason to get canceled at that point. I am sure there are exceptions, but that would be way out of the norm. I have a build scheduled for 9/26 and feel confident that will go.