Window sticker

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

stg4021

Member
Joined
Jun 16, 2021
Posts
35
Reaction score
68
Location
Corning, Arkansas
B25BEDD1-9ECA-4DA2-A556-93D99C197C67.jpeg
Can someone help me understand the window sticker? What’s the blend date and what is the date at the very bottom? It changed from 9/2 to 8/26
 

Floyd554

Full Access Member
Joined
Aug 13, 2021
Posts
286
Reaction score
589
Location
Belle Vernon, PA
The date on the bottom is initially when the window sticker was generated. After that it is “updated/reviewed” in the system. This usually occurs on a weekly basis. The blend date on top is when it was initially scheduled to be in production. One FP rep initially told me that the blend date is when it was to be built by. Another FP rep told me that it is the start of actual production. Mine has a blend date of 08/31. It is still showing as in production today. It was last updated on the bottom of my window sticker on 9/1. And that’s all I know about that.
 

Oggie

Full Access Member
Joined
Apr 24, 2021
Posts
235
Reaction score
330
Location
California
I’ve seen 13 versions of my window sticker since 10/13. Other than the date in the center footer, every sticker is identical. I presume the sticker print date updates whenever something happens with the truck. Anyone know whether that’s correct, and if so, what might prompt the update?
 

ek5686

Member
Joined
Aug 25, 2021
Posts
32
Reaction score
10
Location
Southern CA
Anybody have an idea what these codes? Especially the ‘Rebill’ part?

I’ve seen other stickers where it says ‘Normal’. Just trying to decipher this to increase my anxiety and anticipation of actually getting a truck delivered.
10C799EA-6308-4630-BA4A-9147E7DFF4F0.jpeg
 
Top