Waiting room for those with 2020 Raptor on order...

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

mkarlin27

Full Access Member
Joined
Aug 14, 2019
Posts
113
Reaction score
33
Location
Northshore, MA
On the ford tracking website my window sticker has populated and it says "In Production". Window sticker won't open yet, but is on the page so feel like that is positive progress.
 

Hankfd

Full Access Member
Joined
Jul 18, 2019
Posts
103
Reaction score
33
Location
Ny
6wks in and I got nothing but a receipt so far for. 1k deposit. It is a long wait but I think it’s worth it to get exactly what you want
 

Rboosted717

Member
Joined
Jul 15, 2019
Posts
15
Reaction score
12
Location
California
Update: my estimated delivery moved from 12/22 to 12/20 and this was moved up to 12/23. The status still shows Awaiting Shipment and oddly the next "In Transit" step shows 33 days.
 

nmp1

Full Access Member
Joined
May 30, 2019
Posts
315
Reaction score
343
Location
NJ
under where it says special order are the numbers 12 03 19. thats the date the parts get sent to the factory, the truck usually gets built about a week after that date. fyi the dates will jump around a lot, my truck actually showed up almost a week early.
 

Rboosted717

Member
Joined
Jul 15, 2019
Posts
15
Reaction score
12
Location
California
under where it says special order are the numbers 12 03 19. thats the date the parts get sent to the factory, the truck usually gets built about a week after that date. fyi the dates will jump around a lot, my truck actually showed up almost a week early.

I thought you go off the Blend Date. That's the date the truck will be "blended/added into" the production line. The date under Special Order is the date the order was processed by the factory which is typically several days or a week before the blend date aka the actual production date. In this case his blend is 220191210 which would be 12/10/2019. The 2330 is the assigned semi-sequential place in the production line.
 

nmp1

Full Access Member
Joined
May 30, 2019
Posts
315
Reaction score
343
Location
NJ
I thought you go off the Blend Date. That's the date the truck will be "blended/added into" the production line. The date under Special Order is the date the order was processed by the factory which is typically several days or a week before the blend date aka the actual production date. In this case his blend is 220191210 which would be 12/10/2019. The 2330 is the assigned semi-sequential place in the production line.
I don’t know if it changes but if you get the more detailed print out from your dealer like I did that number on the window sticker was the same date listed from the dealer labeled as parts sent to factory.
 
Top