3/7 Squad

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

Rick955

Full Access Member
Joined
Sep 24, 2021
Posts
239
Reaction score
173
Location
CT
Just checked with FP... According to the system, it shows as last updated on 02/12, with a scheduled build day of 3/08. At least it may finally get built... but how long until it actually ships remains to be seen!
 

Jax L

Member
Joined
Feb 8, 2021
Posts
42
Reaction score
35
Location
Arizona
I was originally scheduled for 2/21 then pushed to 3/7. Just checked today and my 22 CO 37PP just went into production. May actually get to see the truck before Russia gets here but I'm not counting on it. Not at the pace Ford is going.
 

Gary Gere

FRF Supporting Member
Supporting Member
Joined
Aug 13, 2019
Posts
48
Reaction score
80
Location
whitefish Montana
Update: ordered 2022 fully loaded 35 confirmed 10/15, VIN assigned 11/12, production date 1/24, 1/31, 2/7, 2/14, 2/28, 3/7 now 3/14. Every week it gets pushed out a week. I do not know why Ford is even setting these dates. I would not get my hopes up until it’s built & on its way.
 

Tampaukfan

Full Access Member
Joined
Jul 28, 2019
Posts
116
Reaction score
164
Location
Florida
2022 ordered 10/14.. production date 12/31, 1/22, 2/21,2/04,2/08,2/14,2/15,2/19,3/02, 3/03 now 3/07. 37PP with priority code 1. 99.9% chance that it doesn't get built on 3/07.. it would be better if Ford didn't give us any dates other than when the build is 100% locked in.
 

xxxspace

Full Access Member
Joined
Oct 28, 2021
Posts
192
Reaction score
179
Location
Michigan
2022 ordered 10/14.. production date 12/31, 1/22, 2/21,2/04,2/08,2/14,2/15,2/19,3/02, 3/03 now 3/07. 37PP with priority code 1. 99.9% chance that it doesn't get built on 3/07.. it would be better if Ford didn't give us any dates other than when the build is 100% locked in.
Base on Jan 31 squad, Dearborn is catching up to 02/08 blend date as of last Friday.

My blend is 02/04 and did not get to the assemble line until 02/22
 

ThankU45

Full Access Member
Joined
Jun 27, 2021
Posts
224
Reaction score
216
Location
MA
Base on Jan 31 squad, Dearborn is catching up to 02/08 blend date as of last Friday.

My blend is 02/04 and did not get to the assemble line until 02/22
Do you have a sense for how long to get to built once it's on the assembly line? So how much longer past 2/22 until status shows Built. Or is that hard to tell as well.

I'm just a little behind you - was told in Production since 1/31, had a blend date of 2/8, and as of yesterday tracker shows an In Production date of 2/25, estimated delivery of 3/26, and modules have popped.
 

cdiddy4224

Full Access Member
Joined
Sep 23, 2021
Posts
375
Reaction score
473
Location
USA
I've been moved back one day to 3/10....as long as I stay in that week...fingers crossed
 
Top