My scheduled build date for my 2022 Raptor was supposed to be the week of Feb 7th.........then Feb 21st.
I called my dealer this past weekend to ensure the above date was still on schedule and the answer I got was: "uhhh......I think so. Let me check".
After checking, he discovered it's now pushed back to the week of April 4th.
My build has literally nothing additional outside of the 801A package. I even omitted the bed liner b/c that has delayed production.
I'm starting to wonder if it may be sometime in the fall that I actually see this truck and it's leaving me a bit concerned about build quality.
I called my dealer this past weekend to ensure the above date was still on schedule and the answer I got was: "uhhh......I think so. Let me check".
After checking, he discovered it's now pushed back to the week of April 4th.
My build has literally nothing additional outside of the 801A package. I even omitted the bed liner b/c that has delayed production.
I'm starting to wonder if it may be sometime in the fall that I actually see this truck and it's leaving me a bit concerned about build quality.