What up everyone.
We finally had some time to head out to the desert today to really start playing with the dual shock setup. After bearing the 100+ degree heat we are about 80% of where we want to be with this front end setup. The baseline is down, and it is fast. We have about one more minor valving change and this setup will be ready for the market. Stay tuned later this week for pricing.
I cant thank everyone enough who made it out there today. It was a blast.
Thanks for looking
We finally had some time to head out to the desert today to really start playing with the dual shock setup. After bearing the 100+ degree heat we are about 80% of where we want to be with this front end setup. The baseline is down, and it is fast. We have about one more minor valving change and this setup will be ready for the market. Stay tuned later this week for pricing.
I cant thank everyone enough who made it out there today. It was a blast.
Thanks for looking