Hi
Just joined the raptor forum. No raptor as of yet but placed my order 9/6/11 and have a VIN number. My dealer (based in WA) gave me 2 VINs, one with build date 11/7 eta IS 11/23/2011, this was not my original order but they were allocated another raptor and built it the way I wanted (silver, screw, lux package, no front camera, no moonroof and no stickers). My original order has build date of 11/14 and ETA is 12/4/2011. My dealer says I can have which ever makes it first to the floor. Im excited about a possible raptor prior to Thanksgiving. Will definitely keep you posted.
Just joined the raptor forum. No raptor as of yet but placed my order 9/6/11 and have a VIN number. My dealer (based in WA) gave me 2 VINs, one with build date 11/7 eta IS 11/23/2011, this was not my original order but they were allocated another raptor and built it the way I wanted (silver, screw, lux package, no front camera, no moonroof and no stickers). My original order has build date of 11/14 and ETA is 12/4/2011. My dealer says I can have which ever makes it first to the floor. Im excited about a possible raptor prior to Thanksgiving. Will definitely keep you posted.