Igor Sakhnov
Member
Resurrecting this old thread as I need some help from SMEs.
I'm planning to run three LP6s and would prefer to utilize AUX switches in the following manner - first one to flip the first relay that controls the power, and the second AUX to trigger the second relay that is in "open" state powers lows and in "close" state powers highs . Both AUX switches would be used just to trigger the relays and power would still be needed to come from somewhere else.
Any issues with such set up and where do I pull the power from?
Thanks!
I'm planning to run three LP6s and would prefer to utilize AUX switches in the following manner - first one to flip the first relay that controls the power, and the second AUX to trigger the second relay that is in "open" state powers lows and in "close" state powers highs . Both AUX switches would be used just to trigger the relays and power would still be needed to come from somewhere else.
Any issues with such set up and where do I pull the power from?
Thanks!