TigerRaptor
Full Access Member
Weird. QC issues maybe? Any options that are now material hold (BL, CC)?
No beadlocks or carbon.
Last edited:
Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.
Weird. QC issues maybe? Any options that are now material hold (BL, CC)?
Mine says "220170817" so I guess ours will be build one day apart...
It kills me to read here about people placing orders a few weeks ago and already getting build dates. I placed my order in January, got shafted on a 2017 allocation and am just waiting. I figure it's going to be another 6 weeks before I'm actually driving the truck.
Ok boys I got a call Friday saying my Truck delivery was delayed. Ford Area Rep said " new DTG 9/20 and normal process will begin". Dealer had no idea what this meant. Searched my window sticker today and the Build Date and Blend is gone. The method of transp. changed form Convoy to Rail. The boxes at the top have changed as well. Anyone experience this?
What is the difference between convoy and rail? In terms of timing...
I had the same thing happen to my sticker too. Before the truck was built the sticker had the date up top etc. I got a message from dealer last Monday saying it was on a train. I checked my window sticker and the numbers at the top are not there and my transport changed from Convoy to Rail also...
My truck was produced on 7/31 and but today the Windows Sticker is gone.
Have time, sorry.
Stupid auto correct.
Sent from my SM-N910V using Tapatalk