ray101381
Full Access Member
I called that one.....you have a real problem man. You need help.
no seriously, i'm done until everything gets installed. KHC will be doing all the work, spindle gussets will be TIG welded and i'll just have them do the stage 3, uca's, tie rods, mid perch, spc cam bolts/alignment, at the same time. i'll have all the rigid lights installed and ICON PSR done within the next two weeks. i'll do the cam covers after the lights and psr. vinyl wrap on the 15th. and whenever i decide to drive the truck instead of working on it at 2500 miles i'll do the mag hytec rear diff cover with amsoil fluids and do the oil change too. about a 3 week lead time on the whipple, so it looks like mid to late spring until that gets done. almost forgot, shocks! once i get to KHC i'm hoping to get a ride in the fox rpg 3.0 truck and the icon truck they have, we'll see which i like better.
Last edited: