GEN 2 Order Dates 2018

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

dewalt

FRF Addict
Joined
Dec 12, 2016
Posts
1,033
Reaction score
527
Posted 05 February 2017 - 06:23 AM

Per Friday's FDNB (Fleet Distribution News Bulletin) below is the model changeover schedule for the 2017/2018 F-150.



05/05/2017 - 2017MY Fleet Final Order Date
05/04/2017 - 2017MY Last Day to Spec Change
07/02/2017 - 2017MY Job Last Date



05/15/2017 - 2018MY Order Bank Open Date
06/15/2017 - 2018MY Scheduling Begins
07/17/2017 - 2018MY Job #1 Date

The 2018 F-150 Order Guide will be available on or about the date that the USOB (Unscheduled Order Bank) opens and will be uploaded to the Order Guide section at that time.


osted 11 February 2017 - 06:23 AM

The following options are content that is unique to one F150 plant.



Dearborn Truck Plant

Limited Version (900A)
Platinum series (700A/701A)
Lariat Special Edition (61L)
XLT Special Edition(61X)
Power Running Boards (18P, Standard w/700A/701A)
Raptor (X1R, W1R)
Avalanche Exterior Paint (DR)


Kansas City

8’ bed-Regular Cab w/141” WB or Super Cab w/163” WB
Heavy Duty Payload Package (627)
Crew Chief (47C)
CNG/Propane Gas Engine Prep Package (98G)
Race Red Exterior Paint (PQ)
 

RaptorScrew

FRF Addict
Joined
Mar 12, 2011
Posts
3,213
Reaction score
1,903
Location
Oronoco, MN
Posted 05 February 2017 - 06:23 AM

Per Friday's FDNB (Fleet Distribution News Bulletin) below is the model changeover schedule for the 2017/2018 F-150.



05/05/2017 - 2017MY Fleet Final Order Date
05/04/2017 - 2017MY Last Day to Spec Change
07/02/2017 - 2017MY Job Last Date



05/15/2017 - 2018MY Order Bank Open Date
06/15/2017 - 2018MY Scheduling Begins
07/17/2017 - 2018MY Job #1 Date

The 2018 F-150 Order Guide will be available on or about the date that the USOB (Unscheduled Order Bank) opens and will be uploaded to the Order Guide section at that time.


osted 11 February 2017 - 06:23 AM

The following options are content that is unique to one F150 plant.



Dearborn Truck Plant

Limited Version (900A)
Platinum series (700A/701A)
Lariat Special Edition (61L)
XLT Special Edition(61X)
Power Running Boards (18P, Standard w/700A/701A)
Raptor (X1R, W1R)
Avalanche Exterior Paint (DR)


Kansas City

8’ bed-Regular Cab w/141” WB or Super Cab w/163” WB
Heavy Duty Payload Package (627)
Crew Chief (47C)
CNG/Propane Gas Engine Prep Package (98G)
Race Red Exterior Paint (PQ)



What do these mean?
 

Wolfeman

Full Access Member
Joined
May 15, 2016
Posts
408
Reaction score
256
Thanx - I was referring to my two highlighted portions...




Sent from my iPhone using Tapatalk

Looks like options that will only be produced at the Kansas City truck plant and not Dearborn. Raptor is only produced at Dearborn so no Race Red.
 

hamster

FRF Supporting Member
Supporting Member
Joined
Mar 14, 2016
Posts
1,159
Reaction score
842
Location
Northern VA
Posted 05 February 2017 - 06:23 AM

Per Friday's FDNB (Fleet Distribution News Bulletin) below is the model changeover schedule for the 2017/2018 F-150.



05/05/2017 - 2017MY Fleet Final Order Date
05/04/2017 - 2017MY Last Day to Spec Change
07/02/2017 - 2017MY Job Last Date



05/15/2017 - 2018MY Order Bank Open Date
06/15/2017 - 2018MY Scheduling Begins
07/17/2017 - 2018MY Job #1 Date

The 2018 F-150 Order Guide will be available on or about the date that the USOB (Unscheduled Order Bank) opens and will be uploaded to the Order Guide section at that time.


osted 11 February 2017 - 06:23 AM

The following options are content that is unique to one F150 plant.



Dearborn Truck Plant

Limited Version (900A)
Platinum series (700A/701A)
Lariat Special Edition (61L)
XLT Special Edition(61X)
Power Running Boards (18P, Standard w/700A/701A)
Raptor (X1R, W1R)
Avalanche Exterior Paint (DR)


Kansas City

8’ bed-Regular Cab w/141” WB or Super Cab w/163” WB
Heavy Duty Payload Package (627)
Crew Chief (47C)
CNG/Propane Gas Engine Prep Package (98G)
Race Red Exterior Paint (PQ)

Some this means I have less than 4 months more to wait for my 2017 build.
 

rms8

Full Access Member
Joined
Jul 27, 2016
Posts
166
Reaction score
94
05/05/2017 - 2017MY Fleet Final Order Date
05/04/2017 - 2017MY Last Day to Spec Change
07/02/2017 - 2017MY Job Last Date



05/15/2017 - 2018MY Order Bank Open Date
06/15/2017 - 2018MY Scheduling Begins
07/17/2017 - 2018MY Job #1 Date




With these dates in mind....

If my allocation is the last one from my dealer (I am #3 of 3), can I assume my order will get pulled for production BEFORE May 15th ???




.
 
Top