So my build date is Feb 20, yes 6 days if all goes to plan. Ordered Oct 14.
Black mirror replacement covers
McGard tailgate lock
Radar detector hardwire kit
SVT Hitch cover
Airaid Intake
ARB Recovery strap with D Rings
Bakflip F1
Bedrug
55w 6k HID headlights
Thats my first round, I havent even seen a 2012 yet so I figure that should hold me over until I see what else needs to be upgraded.
Black mirror replacement covers
McGard tailgate lock
Radar detector hardwire kit
SVT Hitch cover
Airaid Intake
ARB Recovery strap with D Rings
Bakflip F1
Bedrug
55w 6k HID headlights
Thats my first round, I havent even seen a 2012 yet so I figure that should hold me over until I see what else needs to be upgraded.