Reply to thread

You’re in waters few have explored with that setup. I would make sure whatever they tapped into can handle the additional load in addition to the connections themselves. I’m not the best electrical guy by any means but I think you’re on the right track. I’d stick on the electrical path after verifying the MAF is not compromised. Keep us posted.


Top