jsimon77
Active Member
I got the same on hold message here as well. Blend was 2/3, in production date shows 2/6, ETA I was told from FP was 3/20. Fully loaded 35.
Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.
Where did you hear that? How long is this supposed waiting period before they can be resequenced into the line?I’ve heard somewhere that for our trucks on chip hold they have to be taken offsite to a holding lot and wait for a certain amount of time before being taken back to the plant where they have to be placed back on the production line to have the missing chips installed. This is such a sh*tty way of handling this, at this point I would rather have the truck delivered without the missing chips and have the dealer install them whenever they can get them in. Like I’m still very much struggling to understand how they can send our orders to the plant without having all the parts to finish these trucks and even worse how some trucks get held back while others go through. Makes no sense at all.
3-6 Months I'd sayWhere did you hear that? How long is this supposed waiting period before they can be resequenced into the line?
I don’t remember if it was on here somewhere, the f15014gen forum or the gen 3 Facebook page, they all kinda start blending together at some point. And to give you an idea of how long it could take go check out the 10/11 squad… trucks went into production early last October and some guys are still waiting.Where did you hear that? How long is this supposed waiting period before they can be resequenced into the line?