1: Central air distribution system around the car for air jacks and tyre inflation. ( finished)
2: Removal of deep mine shaft drilling tools for shoes. (BFG AT tyres.) Design and make bead lockers for new Nitto Dune Grappler shoes.
3: RDS 54' on the roof.
4: SS 316 my design/ engineered and made Pre Runner with Talon 18 and a second round of RDS /E series built in or maybe 2 or 3 smaller RDS.( depends on design drawings and how i feel at the time of drawing it all up.)
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.